Design, manufacturing and testing of the inner cone, outer cone and beam dump

JULY 2014 – JUNE 2016, MARCH 2015 – JULY 2016 AND DECEMBER 2015 – JULY 2018

CIEMAT, MADRID, SPAIN – ROKKASHO, JAPAN

This project has the function of braking and neutralizing the deuterons in the form of residual energy coming from the IFMIF LIPAc accelerator. This braking is done by receiving the impact of deuterons on the inner copper cone and transforming all this energy into heat. The outer cone is used to create a chamber with the inner cone. This chamber receives water and performs a cooling circuit that dissipates the heat from the inner cone.

The mentioned residual energy is radioactive, therefore the function of the beam dump is to create a containment system through different layers of different materials (copper, aluminum, polyethylene and carbon steel) surrounding the cones.

Alcance

DETAIL MANUFACTURING DESIGN
PURCHASING OF RAW MATERIAL
WELDING
FINAL MACHINING
LASER DIMENSIONAL CONTROL
SURFACE TREATMENT (DEGREASING Y CLEANING)
BAKE OUT
HELIUM LEAK TEST
MECHANICAL ASSEMBLY & DISASSEMBLY

Especificaciones Técnicas

MATERIAL: COPPER, HIGH ALUMINUM AW-5083, POLYETHYLENE (HIGH DENSITY AND HIGH MOLECULAR WEIGHT), S355J2+N CARBON STEEL
VACUUM TIGHT WELD ACC. ISO 5817 QUALITY “B”
LEAK TESTING
– VACUUM: 3.43 x 10-7 mbar.
– GOBLAL LEAK RATE < 10-7 mbar•l/s
CLEANING COMPATIBLE WITH HIGH VACUUM APPLICATION
HIGH TOLERANCES FOR FINAL MACHINING
– 0,05 mm IN POSITIONING and PLANITY