MORE THAN 20 YEARS OF EXPERIENCE IN THE MANUFACTURING OF VACUUM CHAMBERS

VACCUM CHAMBER FOR THE F1 BEAM TRANSPORTATION

MARCH 2021 - OCTOBER 2021

VACCUM CHAMBER FOR THE F1 BEAM TRANSPORTATION

Portée

  • DETAIL MANUFACTURING DESIGN + CALCULATIONS
  • PURCHASING OF RAW MATERIAL
  • WELDING
  • NON DESTRUCTIVE TESTS
  • FINAL MACHINING
  • LASER DIMENSIONAL CONTROL
  • SURFACE TREATMENT (PICKLING and PASSIVATION)
  • ULTRASONIC CLEANING PROCESS
  • RGA TEST
  • HELIUM LEAK and VACCUM TEST
  • ASSEMBLY AT SITE

Spécifications techniques

  • MATERIAL: AISI 304L (1.4307)
  • DIMENSIONS

                – APO-LPA-021-11000-EM_0000

                                 3644 x 2200 x 5050

  • LEAK TESTING

          –  VACUUM: 3 x 10-7mbar

          –  BACKGROUND:  2,9 x 109 mbar·l/s

  • HIGH TOLERANCES FOR FINAL MACHINING

          –  0,2 mm IN POSITIONING and PLANITY

 